Picanol_logo_2020.jpg
Concept Picanol Group.jpg

Picanol Group’s new head office to be shaped like weaving shuttle

Posted December 9, 2021

 

YPRES, Belgium – Picanol Group announced the construction of a new head office in its hometown here.

 

The new building will house 450 employees and it will be erected on the company's current site, between its training center and the Zuiderring road. The architectural design of the new headquarters – which will be shaped like a weaving shuttle – reflects Picanol's rich weaving machine manufacturing history.

 

The building is a design by AAVO Architects and will have a floor area of 20,000 square meters, including a parking garage and a basement area of 7,500 square meters. With this project, Picanol Group is ensuring the sustainable anchoring of the group in Ypres.

 

Growth in recent years has meant that Picanol Group has struggled for some time with the lack of space at its current premises. With this in mind, a project was initiated to house some staff of Picanol and PsiControl (part of Picanol Group), as well as all group functions, in a single new office building.

 

This new head office will consist of two floors, containing spacious reception areas for visitors, meeting rooms, an auditorium, and offices. The two oval-shaped upper floors will house offices, meeting rooms, a company cafeteria and a roof terrace. Meanwhile, car and bicycle traffic will access the head office via a planned entrance/exit on the Zuiderring.

 

Sustainability focus 
 

The building’s interior architecture is open and transparent with the aim of promoting collaboration between the company’s departments. Furthermore, the building will use the latest technology and materials to make it as sustainable and energy friendly as possible. This will include the use of geothermal and solar energy.

 

There will also be a green roof area and the building’s surroundings will be laid out according to the latest soft nature management insights. 

 

Construction work is planned to start in the second quarter of 2022. The work will take up to two years to complete, with the new head office scheduled to open in 2024.

 

Source: Picanol

  • LinkedIn
  • Wix Facebook page
  • Instagram
  • Wix Twitter page
PAF Sales-BTSR eTC Website ad_093020-Opt
Mezger-sidebar-ad-230X124-062816-Draft2_
SSM_eTextileCommunication_Banner_230x124.gif
Zimmer_ad_inside_920X496.jpg
Banner_WeavingTechnical_ETC_230x124.gif
Navis-TubeTex-Web-Inside-Page-090518_opt
STA_ad_011520-optimized_compressed.gif
ATMA_Techtextil 2021 ad_website_011121-O
Lang_Ligon_eTC_inside_pages_ad_2021-comp
AB Carter-website ad_051021_DRAFT1.gif
Murata_eTC_Ad_111619_FINAL.gif
Frankl-Thomas-sidebar-ad-080117_256_opti
ETC_banner_4_REAL_MoreRES_compressed.jpg